ENVIRONMENTAL SERVICES

CDM Engineering Ukraine offers a comprehensive range of environmental consulting services to clients in various industrial sectors. Our environmental services team includes experts with backgrounds in the environmental and social sciences, health and safety, chemistry, economics and law.

Most of our experts are fluent in English and have experience working with both local and international standards (EBRD, World Bank, EU). Our environmental, social and health & safety experts have completed extensive professional training and possess all recognized professional certifications (ISO, OHSAS).

 

Environmental Impact AssessmentWe provide Environmental Impact Assessments as required by Ukrainian law, both OVNS as part of every project design, and OVD as required for construction permitting purposes.

Environmental and Social Impact AssessmentOur experts are certified and experienced in delivering ESIAs in accordance with international requirements (EBRD, IFC, EIB) as often requested for the assessment of investments financed by IFIs. Our team has performed this study for projects in various sectors. This type of assessment covers all relevant direct and indirect environmental, social, health & safety impacts and issues of the project’s operations at all the stages of the project cycle: pre-construction, construction, operation, and decommissioning and closure.

Environmental Due DiligenceESDD and HSDD are the systematic studies of the environmental, social and health and safety compliance of an operation with local and/or international standards, and the potential impact of planned changes to that operation. In addition to corporate sustainability benchmarks that are increasingly common, ESDD and HSDD are applicable for mergers & acquisitions, operations modernization / reconstruction, business restructuring, attraction of equity investment / IPO, or applying for IFI funding. For the purposes of EDD, we can provide soil, water and air testing at laboratories in or outside Ukraine.

Environmental Site AssessmentA Phase I ESA is aimed at the identification of potential environmental risks and liabilities of a specific location (site) that may have resulted from existing or previous land use or the use of territory adjacent to the subject location. A Phase I ESA results in initial conclusions on potential risks to human and/or other receptors and determines whether there is a need for further investigation, and the scope of those investigations (Phase II ESA Exploratory Investigation).

A Phase II ESA is an investigative survey involving soil and surface/groundwater sampling and laboratory testing. It elaborates in specific detail any existing environmental contamination.

A Phase III ESA is a Remediation Action Plan, which is a detailed strategy for the remediation of polluted media.

Contacts

20 Esplanadna Street, office 1102, Kyiv 01601, Ukraine
+38 044 364 0019
+38 044 364 0012
This email address is being protected from spambots. You need JavaScript enabled to view it.
www.cdmukraine.com

Follow us on:

Quick Contact

© LLC "CDM Engineering Ukraine", 2013 – 2022.
All rights reserved.

Search